chineseenglish
  • Home
  • About us
  • Product
    • WHAT IS STONE-TECH®?
    • WHERE CAN STONE-TECH® BE USED?
    • WHY DO YOU USE STONE-TECH®?
    • HOW TO USE STONE-TECH®?
      • Preparation
      • Drill holes
      • Mix mortar
      • Fill holes
      • Crack object
    • TYPES OF STONE-TECH® AVAILABLE
    • PACKAGING & STORAGE
    • TIPS ON HOW TO USE STONE-TECH®
    • HOW TO PREVENT BLOWOUT SHOOTS?
    • SAFETY PREVENTION
    • MSDS
  • News
  • Contact us
  • WHAT IS STONE-TECH®?
  • WHERE CAN STONE-TECH® BE USED?
  • WHY DO YOU USE STONE-TECH®?
  • HOW TO USE STONE-TECH®?
    • Preparation
    • Drill holes
    • Mix mortar
    • Fill holes
    • Crack object
  • TYPES OF STONE-TECH® AVAILABLE
  • PACKAGING & STORAGE
  • TIPS ON HOW TO USE STONE-TECH®
  • HOW TO PREVENT BLOWOUT SHOOTS?
  • SAFETY PREVENTION
  • MSDS

Product

CRACKING OBJECT:



The crack appears in around 6 hours after filling of STONE-TECH® mixture. It varies depending on material of cracking object, holes design and temperature, etc. STONE-TECH® continues to increase pressure for 3 days.
The chemical reaction of STONE-TECH® and water generates heat. If the reaction goes too quickly, the temperature can be above the boiling point of water before all the water has chemically combined with STONE-TECH®. This can result in a steam-driven explosion which blows the STONE-TECH® mortar from the holes with sudden force.
 


<Back >

Copyright(C)2013-2019 SinoSource Enterprise Co., Ltd. All Rights Reserved. Supported by Toocle Copyright Notice 湘ICP备11014736号